R The NIQS President QS Obafemi Onashile,NIQS Chairman-Fellows Forum Mr. Anthony Ndah, and QSRBN Board Member Mr Niyi Ijogun at the Sensitization / Consultation forum of the Federal Min. Of Mines and Steel Dev. with the organized Private Sector under the aegis of Nigerian Economic Summit Group (NESG) in Lagos
Changes. If there is any one all encompassing word that describes what will make your capital project go over budget this is it. You are investing a lot of money and effort into your project and you want to make sure you get what you planned.
The below chart illustrates the relationship between the Cost of Changes to the design and the ease of ability to make these changes as you move through the phases of your project.

During the Planning Phase, design changes can be made easily with very little cost. Moving through the Design Phase, changes will start to cost more and be more challenging to handle due to the numerous consultants required for redesign. Once construction on your projects begin, design changes are more difficult because the Contractor has already agreed on the contract according to the tender documents and specifications. Changes require evaluation, pricing and rescheduling of sub-trades if it affects the schedule. Sometimes these changes result in subcontractor delays or claims.
It is evident that should changes need to be made to the design, making them as early as possible will cost less.
With the detailed estimates prepared by Quantity Surveyors during planning and design, you’ll be able to make informed decisions on your changes. Is it still within the budget? What you may perceive as a simple change may be just that. But there may be underlying cost factors you know nothing about. You’ve fallen in love with a $10,000 marble fountain for your lobby. But you didn’t think about the additional plumbing that would have to go in, the mechanical pumps that would have to be added to the mechanical room, or the structural reinforcement that would be required to support the 5 tonne fountain. At the early stages of design, that change may end up costing $70,000. Once you’ve started construction, the cost of that change may skyrocket to $300,000. And without a detailed estimate prepared by a Quantity Surveyor, you may not even realize the true cost until the bills start pouring in.
Similarly, a Quantity Surveyor’s estimates are imperative in the planning stage. You’ll be able to evaluate options and weigh up the cost impact of any changes being considered. If there is a particular change that is really important to you but the cost exceeds the budget, your Quantity Surveyor can even suggest potential options for reducing costs in other areas which will offset the additional cost of the highly desirable change.

If you are the owner of a commercial property, you may be wondering if your property is adequately insured. Your Insurer may use the term ‘Replacement Cost’ and the terms ‘Reinstatement Cost’ or ‘Reconstruction Cost’, may also be listed somewhere on your policy. While the term ‘Replacement’, ‘Reinstatement’, and ‘Reconstruction’ all seem to have the same meaning, in Insurance terms, they will return vastly different values.

A Building Reinstatement Cost Estimate calculates the cost of the building for insurance purposes. This will ensure you are not over-insuring your building and paying more for insurance than you need to, but also ensures you have enough insurance to cover your building should a loss occur.
The Real Estate Appraisal tells you how much you could reasonably expect to sell the building and land for at the current market value.
This value is not sufficient for insurance purposes because it does not describe the cost you would incur if there was a catastrophic loss and you needed to demolish what was left of the building and rebuild it from scratch.
Owners of commercial properties have the most to benefit from ensuring their property is adequately insured because the risk associated with a loss includes not only significant out-of-pocket building costs, but also the loss of income from the property if there is any delay in reinstating it to its current state.
An Insurance company may ask for one in the process of evaluating a property for a new insurance policy or renewing an existing policy.
As an Owner, to ensure your property is adequately insured, you should have one done for a new insurance policy or at the time of renewal if you are questioning the value of your property and would like an independent opinion.
There is no standard method used by insurance companies but most often a construction cost manual such as Marshall & Swift will be referenced for the unit cost per square foot of a similar type of building and multiplied by the area of the subject building.
Because it is theoretical replacement with a similar type of building and not an actual reconstruction cost evaluation, which includes for all costs associated with reconstructing a building at today’s standards and codes. Other costs are not considered with replacement cost, such as demolition of the existing destroyed building. While replacement cost is merely the cost to replace the building using the same as or far as possible the same material and design as what exists.
For many simple or standard types of buildings the replacement cost taken from a cost manual may be appropriate. However if there is any non-typical or unique characteristics to the property it will likely not be appropriate. For any special purpose property or special use property only a detailed reconstruction cost estimate prepared by a Quantity Surveyor will properly account for all the unique characteristics present.
In many cases, the replacement cost calculated from the ‘black book’ value will not be enough to cover the costs to rebuild the property. Should a loss occur, the owner would be out of pocket for rebuilding expenses over and above the ‘black book’ value. It is recommended that in all cases, a reconstruction cost estimate be used, particularly when the property is used for commercial purposes.
Demolition and clearance of the site, shoring up of neighbouring buildings, reinstatement of any non-structure components of the site (such as a parking lot, landscaping or below grade services) allowance for the escalation of the cost of labour and materials in the future, permit fees, and any premiums associated with construction for the property’s geographic area.
The ‘black book’ value also does not take into consideration that should your property need to be rebuilt, it would have to be built to be compliant with the current building code, which could have a serious impact on the design and materials you must use to rebuild. A Replacement Cost Estimate will only cover the cost to replace the building with one of comparable size, utility and materials. For example, it would not take into account that your new building will require an elevator (where a narrow staircase previously sufficed).
Heritage components, current building codes, construction standards, accessibility, building material availability, etc.
A Quantity Surveyor would require scaled drawings of each floor and photos of typical interior and exterior finishes. If this documentation is not available, the Quantity Surveyor can perform a site visit to measure and evaluate the property.